Planning bid made for new sculpture
Published Date:
09 September 2008
Plans are under way for the installation of Wigan's latest piece of public art. Wigan Council has received a planning application for this Face sculpture at The Wiend in Wigan town centre.
Vertical Face by Rick Kirby, a 5.5m high stainless steel sculpture of a face, was the clear favourite of Wigan shoppers, who left positive comments during consultation that took place in July last year.
Funding totalling almost £80,000 was provided by Modus Properties, the developers of the Grand Arcade, as part of an agreement with the council to fund a new major piece of public art.
Rick Kirby is an acclaimed English sculptor, best known for more than 25 striking pieces of public art, including Continuum, at Alexandra Park Lake in Hastings and Cross the divide, at South Bank in London.
Speaking of the work, he said: "The face is a play on the many portrait busts of the 'good and the glorious' that adorn the parks and centres of every town and city throughout Britain.
"The sculpted portrait is intended to represent not a single celebrity, but all of the inhabitants of the area, the very people of Wigan.
"These are the people who make that place what it is today, and indeed have the power to determine what will be its future."
To the rear of the piece, the highly reflective surface of the stainless steel blocks, set at slightly different angles, will form a huge multi-split screen which will mirror fragments of people as well as the surrounding buildings and landscape.
The artist added: "The layered face and hi-tech blocks also represent the process of regeneration, building layer upon layer a more prosperous and positive future for the landscape, economy and ultimately, and most essentially, the people."
Wigan town centre will be the first port of call for the sculpture, which will make a tour of the borough over the coming years.
It is intended that the piece will spend up to 18 months in the town centre, before being moved to another location.
Plans for the proposal are currently being assessed by council planners and can be inspected at the Environmental Services Department in Civic Buildings, New Market Street or online at www.wigan.gov.uk (application ref A/08/71883).
All comments should be made by 28 September.
Subject to planning permission it's hoped the work can be installed before Christmas.
The full article contains 408 words and appears in Wigan Evening Post newspaper.
-
Last Updated:
10 September 2008 2:42 PM
-
Source:
Wigan Evening Post
-
Location:
Wigan