MPs have asked Wigan Council to reject plans for 1,500 new homes in Leigh
Two MPs have urged the council to reject plans for almost 1,500 new homes in Leigh.
A detailed blueprint has been submitted for 1,491 homes and a section of trunk road at North Leigh Park.


But in a letter to Wigan Council’s planning team, both Makerfield MP Josh Simons and Jo Platt, who represents Leigh, said they thought the plans were not suitable.
They said they “will not support a single new house without the right community infrastructure first.”
They said homes should not be built before delivering an east to west link road in full, from the M6 to the M61, via Hindley Green, North Leigh and onto Bolton.
Last month, the Government committed £153m to build part of a link road between Wigan and Bolton, connecting the A49 in Wigan to the A58 in Hindley.
The MPs said that section of the link road “does not depend on a single house being built or a penny from developers”.
Mr Simons’ letter said: “Alongside my colleague Jo Platt MP, I write to express my objection to the planning application in relation to the North Leigh Park development.
“Levels of congestion in this borough are unacceptable.
“But traffic is not simply an inconvenience, it holds back local businesses, ambulance and police officers, trades, school children and families.
“We need clear assurances about the remaining sections of the road.
“This submission does not appear to include an infrastructure phasing plan or an integrated transport and access plan.
“I cannot support any development without such a plan and will not support this proposal in its current form.”
Outline permission for up to 1,700 homes at North Leigh was approved in 2013, but a new planning application gives details of the layout, appearance, landscaping and scale of the majority of the development.
Two parts of the wider site have previously been developed, with 87 homes built close to Nel Pan Lane by Countryside Properties in 2021 and 99 homes on the northern edge of the site, accessed from Tiverton Avenue, by Bellway Homes.
A design and access statement on behalf of developer Vistry Group said: “The vision for North Leigh Park is to deliver a sustainable, well-connected and attractive new development for Wigan.
“It will deliver part of the new strategically significant highway infrastructure required to connect junction 5 of M61 with junction 26 of the M6.”
North Leigh Park covers a huge 178 acres. The site has an industrial past, used for coal mining, sand extraction quarrying, industrial waste management operations, a scrap yard and sewage treatment.
The new section of road within the North Leigh plans would connect Leigh Road (A578) to Atherleigh Way (A579).
Speaking in January, Matthew Parkes, managing director for Vistry Manchester and Cheshire East, said: “We are pleased to be bringing forward the next phases of North Leigh Park and continuing to work with Wigan Council, the Government and the local community to deliver much-needed new homes in this part of the borough.
“This is a significant opportunity to prevent a complex former industrial site becoming a long-term environmental problem and instead turn it into a well-planned new neighbourhood, with new homes, green spaces, local facilities and improved connections.”
The council will decide on the plans in the coming months.